Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Illinois College’s Crispin Hall was originally built in 1963 and had not been significantly renovated since its construction. The school needed to completely redesign the interior of the building in order to accommodate and offer new education fields, such as neuroscience, engineering, and more. The hall was currently underutilized, lacking modern technology, and visibly depreciating. The hall houses the school’s science and technology departments, making technology a vital part of the upgrades. Also, science laboratories require specialized systems, adding complexity to the project.
We designed all new MEP/FP systems for the building, creating specialized system designs for all science lab spaces. Our electrical system included centralized data distribution and a new audiovisual system (AV), assisting with the facility’s technological advancements. The state-of-the-art center was designed for hands-on learning, providing students with a competitive advantage in technology-rich fields. As a result of the renovation, Illinois College can now offer contemporary learning spaces to attract, engage, and inspire their students, as well as offer new fields, including neuroscience, engineering, actuarial and data management.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved