Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The outdated boilers heating Eastland Medical Plaza, an offsite medical office building, needed to be replaced before they failed. OSF St. Joseph wanted to reduce the number of boilers from four to two to gain space and minimize maintenance but didn’t want to risk losing heating capacity during the transition.
We sized the new system to operate efficiently on a single boiler— reducing maintenance time and expense—and added a second boiler for redundancy so there was no danger of heating loss in case of failure. The new system features better temperature controls for improved modulation and energy efficiency. We completed the work during the summer when there was little to no need for heat, ensuring the system was fully operational for the colder winter months.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s