Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The two air-handling units serving this eight-story patient building have reached the end of their lives. They’re housed in a crowded basement mechanical room with other HVAC infrastructure, making it challenging for service personnel to perform troubleshooting and routine maintenance.
Our design calls for construction of a new steel platform on the roof of the building, which will house a new 25,000 cfm air-handling unit. We will run new ducts to the mechanical room, tie them into the existing ductwork, then remove the existing units. That will free up space in the mechanical room for a comprehensive HVAC system upgrade with new pumps, heat exchangers and chilled water systems. Other upgrades will include power distribution modifications and emergency power additions, as well as all new lighting and fire protection in the mechanical room.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s