Spare Time Entertainment Center was initially started by another electrical contractor that abandoned the project. To keep costs at a minimum, incorporating all existing installation into the new design was vital. The large, 46,000-square-foot facility, featuring a full-service kitchen, multiple bars, an arcade, laser tag arena, bowling lanes, and an outdoor patio, required extensive electrical coordination. The team had to adapt quickly to re-purpose existing work, complete a redesign, and stay within budget.
We collaborated with Nelson Electric to create an efficient, cost-effective design that integrated the existing electrical installations while meeting the project’s diverse requirements. The design was completed in just three weeks, allowing construction to proceed on schedule. This streamlined approach enabled the project to be completed on time and within budget, delivering a fully operational, high-energy entertainment venue.
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved