Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The Illinois Art Institute bought two neighboring houses with the intention of expanding the space into a commercial art studio, equipped for public, art class sessions. However, to achieve this transformation, the building needed major renovations and a large addition. Due to the existing structure originally being a residential home, there were ceiling constraints regarding utilities. The existing mechanical systems needed to be completely removed and replaced. The building also required the addition of an elevator which was especially challenging due to the residential location, as more electrical power is needed than available in this area.
We overcame the power supply issue by incorporating a specialized, single phase elevator and a single-phase rooftop unit (RTU) to minimize power needs. Concealing utilities within the ceiling heights was challenging, however through detailed coordination we were able to make everything fit while remaining hidden from view. We replaced the existing electrical service, designed new mechanical equipment, and re-routed exhaust ductwork. We were able to tie the new sanitary system into the existing incoming service with the addition of sewer ejector pits. KED helped to completely transform the space into a unique, family-friendly art studio, while remaining in-budget.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s