Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Architectural Design Group leased a new, unfinished space within a historic building in Peoria’s downtown warehouse district. The building had sat vacant for many years previously, so all of the existing MEP/FP systems needed to be replaced, as they were outdated and nonfunctional. Being an architecture firm, ADG had a vision for their office, and we needed to create MEP/FP systems that would accommodate their vision.
We worked closely with ADG throughout the entirety of the project, ensuring our system designs would accommodate both their vision, and their day-to-day office functionality. We designed all new electrical, mechanical, plumbing, and fire protection systems for the space, bringing new life to this historic building. As a result, Architectural Design Group now has an appealing, modernized office that better meets their day-to-day needs and is a reflection of their own work and services.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s