Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Illinois Central College needed to renovate an existing campus building to accommodate four new science labs, six lecture halls, and additional educational support spaces. Science labs require specialized electrical, mechanical, plumbing, and fire protection systems, requiring a complete re-design of the building’s existing systems. The labs needed to incorporate fume hoods, emergency shower and eye wash systems, ceiling-mounted fume extraction, acid-resistant plumbing, and access control.
We designed the new science labs to include fume hoods, emergency shower and eye wash systems, ceiling-mounted fume extraction, acid-resistant piping with a neutralizing basin, and access control. All new MEP/FP systems were designed based on the new needs of the facility, including the specialized equipment and systems that are required for the lab spaces. As a result, ICC now has a dedicated campus building to serve the school’s science program, improving educational offerings for its students.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs