Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Aupperle Construction purchased an old electrical distribution center with the intention of turning it into their new office. This brought unique challenges in that the building served an entirely different purpose previously, and all existing systems were outdated and complex. The client also requested that we include radiant-floor heating in our design.
We designed radiant-floor heating for added comfort in the space. All new MEP/FP systems were designed for the building after determining that the existing systems wouldn’t be viable. The office also required all new water service and sanitary, as the site didn’t have this previously. As a result, the Aupperle office was able to keep all of the historic, unique elements of the electrical distribution center while having all new MEP/FP systems for modern-day comforts.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs