THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The client needed to transform a former toy store into a new Burlington Coat Factory location. Burlington Corporate requires a very specific franchise layout for each of its locations. The layout includes pre-determined placements of all store elements, requiring very detailed system planning. The store also had specific intercom communication needs that go beyond the standard systems. There were also no existing building plans, adding to the complexity of the project.
We performed fieldwork to overcome the lack of building plans. We installed a specialized telecom and data system to meet the store’s communication needs, allowing for seamless operation. We closely followed the Burlington franchise plans, matching every detail to ensure all requirements were met. The location has since been approved by Burlington Corporate and is now bringing in revenue and thriving in the marketplace.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s