Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
OSF HealthCare renovated a grocery store built in the 1990s into a medical office building housing multiple providers. The project involved transforming retail space with high ceilings and exposed structures into exam rooms, waiting rooms, offices and a pharmacy—serving occupants with varying requirements for their individual spaces.
Coordination with the client, architect and building occupants throughout the design, engineering and construction process was key to ensuring the renovated building met the needs of both patients and providers. To convert the space from retail to medical use, we installed all-new, energy-efficient mechanical, electrical, HVAC and plumbing systems; dropped the ceiling height by six feet; and added an emergency generator, parking lot lighting, exterior cameras and access controls for safety and security.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs