Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Illinois State University’s Edwards Hall houses classrooms for the college of nursing, general education courses, and more. However, the building’s 2nd and 3rd floor HVAC systems were aging, weren’t energy-efficient, or properly cooling the spaces. The school needed to switch from a constant-volume AHU system to a Variable Air Volume (VAV) system to reduce energy usage. However, two of the three air handlers were too old to support a new VAV system.
New motors were ordered, which allowed the older AHUs to support the new VAV system. Prior to the project, there were only 3 zones for the whole 2nd floor, but with the conversion to the VAV system, the floor now has 10 zones, greatly improving temperature control and comfort. We also added chilled water coils and pumps, improving functionality. As a result, the school now has an energy-efficient system, improved temperatures for student and staff comfort, and greater system control.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs